Planning
IT designed with the fit-out.
- Site survey and requirement study
- Cabling and data point layout
- Server room and rack design
- Coordination with interior and electrical teams
One team plans and delivers all the technology for your new or relocated office: cabling, network, Wi-Fi, servers, security systems, meeting rooms and phones.
A typical plan for a 100–200 seat office. Work starts with the layout, not after the walls are built.
Layouts, data points, server room, systems list.
One itemised quote for every system.
Cabling and containment with the fit-out.
Network, Wi-Fi, CCTV, access, AV and phones.
Desks working; our team on the floor.
Handover pack and AMC.
Everything your new office needs, planned together.
Planned, delivered and documented by one accountable Oreflamme team, then supported after go-live.
IT designed with the fit-out.
The foundation of the office.
Safe from the first day.
Rooms and desks ready to use.
A clear, documented process so you always know what happens next and what you will receive.
Visit the site and review layouts, headcount and needs.
Plan cabling, network, security, AV and phones together.
Install alongside the fit-out, in the right order.
Test every point, link, camera and room.
Set up desks and support staff on day one.
Documentation, training and AMC support.
Vendor-neutral: we recommend the platform that fits your users, budget and growth, not the one with the best margin.
Simple answers to what businesses ask before they buy. Open any card for the full comparison.
At the layout stage, not after.
One partner for speed and accountability.
Every item, quantity and cost.
| Separate vendors | Single turnkey partner | |
|---|---|---|
| Coordination | You manage it | We manage it |
| Timeline | Each waits on the others | One combined plan |
| Accountability | Split | One team |
| Support after move-in | Many contracts | One AMC |
Cabling, network and Wi-Fi, servers, firewall, CCTV and access control, meeting rooms, phones and UPS, planned and delivered by one team on one timeline.
At the layout stage, before walls and false ceilings are built, so data points, racks and access points are placed correctly.
A typical 100 to 200 seat office is planned over about twelve weeks, from survey and design to handover. Smaller offices take less time.
Yes. We pre-build the new network, migrate servers and phones outside working hours and have engineers onsite on the first day.
Share a few details and an Oreflamme engineer will call you back within one business day with clear next steps.